They use a mobile crane for a day (or two days if it's windy and slowing work down as in this case). They setup the concrete base then begin erecting the metal structure of the crane piece by piece. 2 guys on the crane assemble it while one guy operates the crane. There must be a few more guys on the ground but I can't see them. They have 2 little platforms that get moved up level-by-level so the assemblers have a surface to stand on while tightening the connecting pieces together. From what I see the platforms must simply hook over the edge of the structure because it's detached, reattached and being walked on so quickly - maybe 2 minutes including the slowest part: positioning the chain to hoist the thing.
Anyway, it's fascinating and I could watch all day! Oooh! Now it's time for the control centre!!
Gotta run to see it!!